Property Address: Property ID: 0602823430020
3660 40TH AVE S 55406
Issued Type Permit Status Value Applicant Cleared Total
01/04/2017 Res BLDG623628 Closed 45000.0000  CG STEWART CUSTOM CARPENTRY LLC 12/11/2017 $1,482.53

Scope:

New detached garage with 2nd floor ADU 26 x 25. CONSTRUCT ACCESSORY DWELLING UNIT (ADU) ABOVE NEW 25' X 26' DETACHED GARAGE. AAJ#2 ***12/12/2016 - STRUCTURAL MEMBERS ARE DESIGNED BY STRUCTURAL ENGINEER MR. ROLAND V. JOHNSON, P.E. #5964** ENGINEER OF RECORD IS TO MAKE PERIODIC SITE INSPECTIONS AND UPON COMPLETION OF WORK. SUBMIT A LETTER TO CITY OF MINNEAPOLIS - CPED CONSTRUCTION CODE SERVICE DEPARTMENT, STATING WORK HAS BEEN COMPLETED TO SPECIFICATIONS BASED ON HIS DESIGN INTENT. CERTIFICATE OF OCCUPANCY: NOT REQUIRED ADU STYLE: UPPER FLOOR ABOVE DETACHED GARAGE FIRE SEPARATION: PROVIDE ONE HOUR FIRE RESISTANCE WALL BETWEEN GARAGE AND STAIRWAY ON MAIN AND ENTIRE FLOOR/CEILING BETWEEN GARAGE CEILING AND ACCESSORY DWELLING UNIT. MIN. 20 MINUTES FIRE RATED DOOR WILL BE REQUIRED ON FIRE WALL AS NOTED ON FLOOR PLAN. UTILITY ROOM (HVAC) SEPARATION: MIN. ONE HOUR FIRE RESISTANCE WALL AND CEILING OF STAIRWAY ENCLOSING UTILITIES. WATER AND SEWAGE SEPARATION: NOT REQUIRED ELECTRICAL PANELS LOCATION: ELECTRICAL PANELS MUST BE ACCESSIBLE TO ADU OCCUPANT ACCESSORY DWELLING UNIT (ADU) CONDITIONS: ***NOTE: (1) HARDWIRED INTERCONNECTED SMOKE/CO DETECTOR SHALL BE INSTALLED ON EACH FLOOR LEVEL, STANDARD COVERAGE DETECTORS MUST BE PRESENT PER 2015 MN STATE BUILDING CODES. (2) FULL EGRESS WINDOW MEETING REQUIREMENTS OF THE 2015 MINNESOTA STATE BUILDING CODE FOR NEW CONSTRUCTION SHALL BE VERIFIED IN THE ADU BEDROOMS*** (3) THIS PERMIT DOES NOT AUTHORIZE EXISTING FINISHES IF BUILT WITHOUT A PERMIT, ADDITIONAL DWELLING UNIT OR ANY ADDITIONAL WORK OTHER THAN DESCRIBED. ADDITIONAL PERMITS ARE REQUIRED FOR ANY WORK DONE WITHOUT PERMITS*** CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 SEE PLAN FOR DETAIL SCOPE OF WORK TO BE DONE AS WELL AS PLAN REVIEW COMMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. 

Dates
Inspection Dates Inspection Type Result
5/31/2017 RtdAssmb  PartPass 
5/31/2017 JobStatus  Complete 
8/18/2017 Framing  Pass 
8/24/2017 Insul  PartPass 
8/25/2017 Insul  Pass 
12/11/2017 RtdAssmb  Pass 
12/11/2017 ExFinish  Pass 
12/11/2017 Final  Pass 
FEES
Fee Code Description Amount
RES-Permit Permit fee $1,004.50 
RES-Plan Review Plan Review Fee $448.83 
RES-StateSchg Minnesota State Surcharge $29.20 
Total: $1,482.53