Property Address: Property ID: 2602924230105
615 7TH ST S 55415
Issued Type Permit Status Value Applicant Cleared Total
07/10/2019 Commercial BLDG744574 Closed 8077562.0000  WATSON-FORSBERG 08/25/2020 $163,831.07

Scope:

CONSTRUCT 6I UNIT APARTMENT BUILDING , SLAB ON GRADE, (MAA) *******************************certificate of occupancy required YES*************** mechanical plans required for certificate of occupancy YES, mechanical plans/letter of means of compliance submitted YES *********************************** special inspections required SEE SHEET S-0001, ITEM 1.2. AND INSPECTION AGREEMENT FORM ************** , SOUND TESTING REQUIRED AT MINIMUM OF 3 UNITS***************************const type: VA ***********occupancy: R2, S2, B ******************2015 MSBC***************************** occupant load: *************************sprinklered: YES *******************energy code chapter used: ********************MN 2015 ENERGY CODE_____ ************** Elevator Review REQUIRED *********NOTE THAT SMOKE GUARD PRODUCT IS BEING PROVIDED AT ELEVATOR DOORS OPENING ON TO RATED CORRIDOR*********************** Accessibility ___FULLY_______ ************************Tenant: HOUSE OF CHARITY, PROPERTY MANAGEMENT DEVELOPMENT *************************** Floor(s): 4 ***************** SAC: _37_charges _3_credits = _34_ net, met council letter dated _JULY 13, 2018_ ****************************** architect: DAVID HAALAND # 45620, engineer: WILLIAM T BULLER# 20995 *************************** Windows with sill heights less than 24 inches above the floor shall be equipped with fall prevention devices that limit the window opening to less than 4 inches in accordance with MSBC 1303.2320 ********************* CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 907.2.10 ************************** Smoke detection shall be installed: A. on each level of the unit B. in each bedroom C. in the hall or room outside of bedrooms. 907.2.10.2 Power source. In new construction [and units added to existing buildings], required smoke alarms shall receive their primary power from the building wiring where such wiring is served from a commercial source and shall be equipped with a battery backup. Smoke alarms shall emit a signal when the batteries are low. Wiring shall be permanent and without a disconnecting switch other than as required for overcurrent protection. Exceptions: 1. Smoke alarms are not required to be equipped with battery backup in Group R-1 occupancies where they are connected to an emergency electrical system. 2. Smoke alarms are not required to be equipped with battery backup in Group R-2 occupancies equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2. 

Dates
Inspection Dates Inspection Type Result
5/3/2019 JobStatus  Complete 
7/17/2019 JobStatus  Complete 
7/23/2019 JobStatus  Complete 
7/31/2019 JobStatus  Complete 
8/8/2019 JobStatus  Complete 
8/16/2019 JobStatus  Complete 
8/22/2019 JobStatus  Complete 
8/28/2019 JobStatus  Complete 
9/3/2019 JobStatus  Complete 
9/5/2019 JobStatus  Complete 
9/11/2019 JobStatus  Complete 
9/13/2019 Footing  Consult 
9/16/2019 Footing  Pass 
9/19/2019 Foundation  PartPass 
9/26/2019 Footing  Pass 
9/30/2019 Insulation  NotNeeded 
9/30/2019 Foundation  PartPass 
10/2/2019 Foundation  PartPass 
10/7/2019 Footing  Pass 
10/10/2019 Foundation  PartPass 
10/15/2019 Foundation  PartPass 
10/22/2019 Foundation  PartPass 
10/29/2019 Foundation  PartPass 
11/1/2019 JobStatus  Complete 
11/5/2019 Slab  Consult 
11/7/2019 Slab  Consult 
11/12/2019 Slab  Pass 
11/14/2019 Slab  Pass 
11/18/2019 JobStatus  Complete 
11/20/2019 Framing  Consult 
12/5/2019 Framing  Consult 
12/10/2019 JobStatus  Complete 
12/18/2019 JobStatus  Complete 
1/8/2020 JobStatus  Complete 
1/13/2020 JobStatus  Complete 
1/23/2020 JobStatus  Complete 
1/24/2020 Framing  PartPass 
1/30/2020 JobStatus  Complete 
2/6/2020 Framing  Consult 
2/21/2020 Framing  Consult 
2/25/2020 Framing  Consult 
3/5/2020 Framing  Consult 
3/10/2020 Framing  Consult 
3/11/2020 Framing  PartPass 
3/12/2020 Framing  PartPass 
3/16/2020 Insulation  PartPass 
3/18/2020 JobStatus  Complete 
3/19/2020 Framing  Consult 
3/24/2020 Framing  Consult 
3/25/2020 RtdAssmb  Consult 
3/27/2020 Framing  PartPass 
4/6/2020 RtdAssmb  Consult 
4/8/2020 Framing  PartPass 
4/9/2020 RtdAssmb  PartPass 
4/9/2020 Insulation  PartPass 
4/13/2020 ExWthrBr  Pass 
4/14/2020 Framing  PartPass 
4/15/2020 Framing  PartPass 
4/17/2020 COO  Consult 
4/20/2020 RtdAssmb  PartPass 
4/22/2020 Insulation  PartPass 
4/24/2020 JobStatus  Complete 
5/1/2020 JobStatus  Complete 
5/5/2020 Framing  PartPass 
5/8/2020 Insulation  PartPass 
5/12/2020 Insulation  PartPass 
5/15/2020 Framing  PartPass 
5/20/2020 JobStatus  Complete 
5/26/2020 Insulation  PartPass 
5/27/2020 Insulation  Pass 
6/2/2020 JobStatus  Complete 
6/2/2020 COO  Consult 
6/3/2020 Access  Consult 
6/11/2020 JobStatus  Complete 
6/15/2020 JobStatus  Complete 
6/24/2020 JobStatus  Complete 
6/29/2020 JobStatus  Complete 
7/1/2020 JobStatus  Complete 
7/7/2020 COO  Consult 
7/10/2020 JobStatus  Complete 
7/14/2020 COO  Consult 
7/14/2020 Access  Consult 
7/17/2020 COO  Consult 
7/20/2020 COO  Consult 
7/24/2020 ReviewRprt  Complete 
7/24/2020 COO  Pass 
8/3/2020 JobStatus  Complete 
8/11/2020 JobStatus  Complete 
8/25/2020 Access  Pass 
8/25/2020 FndnPreBf  NotNeeded 
8/25/2020 Foundation  NotNeeded 
8/25/2020 Framing  NotNeeded 
8/25/2020 RtdAssmb  NotNeeded 
8/25/2020 Final  Pass 
FEES
Fee Code Description Amount
Commercial Gopher State Charge $37.20 
Commercial Permit Fee $47,060.60 
Commercial Plan Review Fee $30,589.39 
Commercial SAC Full Rate $84,490.00 
Commercial State Surcharge $1,653.88 
Total: $163,831.07